您现在正在浏览:首页 > 试卷 > 计算机 > 南京信息工程大学2012-2013学年第1学期《Designed by Users基于用户设计》期中试卷及答案

免费下载南京信息工程大学2012-2013学年第1学期《Designed by Users基于用户设计》期中试卷及答案

  • 资源类别:试卷
  • 资源分类:计算机
  • 适用专业:基于用户设计
  • 适用年级:大学
  • 上传用户:wmkwmk
  • 文件格式:word
  • 文件大小:174.19KB
  • 上传时间:2013-6-21 1:39:22
  • 下载次数:0
  • 浏览次数:0

安全检测:瑞星:安全 诺顿:安全 卡巴:安全

资料简介
南京信息工程大学2012-2013学年第1学期《Designed by Users基于用户设计》期中试卷及答案
True-False Question. (10%)
A communication diagram captures time-ordering of sequences of interactions in a system.( F )
A statement of project scope is an integral part of a baseline project plan’s introduction section.( T)
In UML use case diagrams, actors exist outside the system that is being modeled.( T )
The goal of normalization is to produce well-structured relations.( T )
In sequence diagrams, a focus-of-control bar represents a period of time during which an object performs an action.( T )
Choice Question (20%)
The programs that are designed to support organizational functions or processes such as inventory management, payroll, or market analysis are called: (d )
systems analysts.
transaction processing systems.
systems software.
application software.
Which of the following tasks is most likely to be performed during the project management and planning phase of the systems development process?( a )
Performing a feasibility analysis
Requirements determination
Deciding which programming languages to use
Constructing user documents and training manuals
Which of the following is primarily concerned with process modeling?( c )
Unified Modeling Language
Entity-Relationship models
Data Flow Diagrams
Rational Unified Process
A defining characteristic of encapsulation is that:( c )
properties of the parent class also exist in the child class.
specific objects are grouped into broader categories.
implementation details of attributes and methods are hidden.
related classes are grouped into packages.
A network diagram is appropriate if you want to see: (C )
division of tasks into subtasks.
degree of temporal overlap between tasks.
dependencies between tasks.
risk level of each task.
For a node with slack time: (a )
earliest estimated completion time precedes latest estimated completion time.
earliest estimated completion time exceeds latest estimated completion time.
earliest and latest estimated completion times are equal to each other.
earliest and latest estimated completion times have no relationship to each other.
........
资料文件预览
共1文件夹,1个文件,文件总大小:345.50KB,压缩后大小:174.19KB
  • 南京信息工程大学2012-2013学年第1学期《Designed by Users基于用户设计》期中试卷及答案
    • Microsoft Word文档南京信息工程大学2012-2013学年第1学期《Designed by Users基于用户设计》期中试卷及答案.doc  [345.50KB]
资料评论
注意事项
下载FAQ:
Q: 为什么我下载的文件打不开?
A: 本站所有资源如无特殊说明,解压密码都是www.xuehai.net,如果无法解压,请下载最新的WinRAR软件。
Q: 我的学海币不多了,如何获取学海币?
A: 上传优质资源可以获取学海币,详细见学海币规则
Q: 为什么我下载不了,但学海币却被扣了?
A: 由于下载人数众多,下载服务器做了并发的限制。请稍后再试,48小时内多次下载不会重复扣学海币。
下载本文件意味着您已经同意遵守以下协议
1. 文件的所有权益归上传用户所有。
2. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
3. 学海网仅提供交流平台,并不能对任何下载内容负责。
4. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
5. 本站不保证提供的下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
返回顶部