毕业设计-3NB—1300钻井泥浆泵—泵壳的设计,正文共30页,15054字,附CAD图纸A0 1张,A21 1张,A3 7张,A4 14张、三维图、答辩PPT、开题报告、外文文献及翻译
查看相关设计:
3NB—1300钻井泥浆泵—动力端的设计,
3NB-1300钻井泥浆泵—液力端系统的设计
摘 要
通过对国内外泥浆泵现状的分析,得出钻井泥浆泵的发展方向:加大输入功率、加大冲程长度、降低冲次、加大最大缸套直径、加大最大泵压、。钻井泵结构设计采用锻焊曲轴、双保险介杆密封结构等,为了迎接我国泥浆泵行业面临的挑战,使我国的泥浆泵产品能昂首走向国际市场,我们从泥浆泵结构不尽合理,难以满足现代钻井工艺的要求出发,对泥浆泵进行结构设计。
本文将对3NB-1300钻井泥浆泵进行详细的结构设计与分析,重点是对泥浆泵的泵壳进行设计与计算。通过本文我们首先了解3NB-1300钻井泥浆泵总体结构,确定泥浆泵的基本参数,然后进一步了解泵壳的各部分结构,最后是钻井泵的安装及日常维护。通过了解,得出当前结构不合理问题,以泥浆泵泵壳的结构、材料、成型方法为出发点,根据泥浆泵的工作原理,经对有关部分进行分析、计算, 对泥浆泵泵壳进行结构设计,以满足现代泥浆泵的钻井工艺。
关键词:泥浆泵;发展趋势;泵壳;安装与维护;
3NB-1300 drilling mud pump - pump shell design
ABSTRACT
Through an analysis of current situation of the domestic and international slush pump, obtain the developing direction of the slush pump of the well drilling: , input power strengthen, strengthen stroke length, reduce, wash time, strengthen most large jar sets of diameter, strengthen most loud pump pigeonhole. The pump structural design of the well drilling adopts and forges and welds the bent axle, dual fail-safe to lie between the sealed structure of the pole etc., in order to meet the challenge that the slush pump trade of our country faces, enable the slush pump products of our country to move towards the international market with one's chin up, we are unreasonable from the structure of the slush pump, the difficult requirement for meeting modern well drilling craft set out, carry on the structural design to the slush pump.
This text will carry on detailed structural design and analysis to 3NB-1300 well drilling slush pump, design and calculate the pump shell of the slush pump especially. We understand 3NB-1300 well drilling slush pump ensemble architecture at first, confirm the basic parameter of the slush pump through this text, then further understand the shelly every part of structure of the pump, the end is installation and regular maintenance of a pump of the well drilling. Through understanding, obtain the unreasonable problem of the present structure, regard pump shelly structure, material, shaping method of slush pump as the starting point, according to the operation principle of the slush pump, through analyzing, calculating relevant parts, carry on the structural design to the pump shell of slush pump, in order to meet well drilling craft of the modern slush pump.
Key Words: Slush pump; Development trend; Pump shell; Install and safeguard;
目 录
摘 要 III
ABSTRACT IV
1前 言 - 1 -
1.1 课题的背景及研究意义 - 1 -
1.2 钻井泥浆泵的现状与趋势分析 - 1 -
1.2.1我国泥浆泵现状 - 1 -
1.2.2国外泥浆泵现状 - 2 -
1.2.3钻井泥浆泵的发展趋势 - 2 -
1.3 现有研究的不足及本文研究的内容 - 4 -
2钻井泵总体设计及主要零部件设计 - 7 -
2.1钻井泵基本参数的确定 - 7 -
2.2钻井泵的整体振动 - 11 -
2.3钻机的钻井泵配置 - 12 -
3钻井泥浆泵泵壳的总体设计 -14-
3.1 钻井泵泵壳的总体方案结构设计 - 14 -
3.2 钻井泵轴承座部分结构 - 15 -
3.3泥浆泵轴承压盖部分结构 - 16 -
3.4钻井泵底座部分结构 - 17 -
3.5钻井泵透气盖部分结构 - 17 -
3.6钻井泵前板部分结构 - 18 -
4 三缸泥浆泵的安装和维护 - 19 -
4.1安装泥浆泵及其吸入系统时注意事项 - 19 -
4.2泥浆泵启动之前的注意事项 - 19 -
5 总 结 - 22 -
谢 辞 - 23 -
参考文献 - 24 -